SPRING 2026 - Road Projects
Crack Seal - Otero Ave, Bauer Circle, 190th Street, Patrick Ave, Peine Ave, Plan Ave, Polk Ave, 188th St, (list is not all inclusive)
Dust control is scheduled for May 28th and 29th weather depending.
(Dec 2025) A Road Right of Way Postcard was mailed to all residents in the township:
Are you redoing your driveway? If so, please take a look at the Driveway Approaches document to make sure the apron of your driveway is lined up with the road correctly.
ATV's / Off-Highway Vehicles
We receive a lot of phone calls in regards to ATV's. Here is a link to the regulations:
www.dnr.state.mn.us/regulations/ohv/index.html